Addressing the Challenges of Reinforced Autoclaved Aerated Concrete (RAAC) in UK Schools

RAAC Removal in an Education Setting

Reinforced Autoclaved Aerated Concrete (RAAC) has emerged as a pressing concern across many properties and sectors throughout the UK, including schools, highlighting the gravity of issues facing some educational institutions. Initially lauded for its lightweight and cost-effective properties, construction companies used RAAC extensively in public buildings, including schools, from the 1950s to the 1980s. However, the material has shown signs of deterioration over the years, sparking safety concerns among the construction industry, educational authorities, parents, and policymakers.

Acknowledging RAAC's vulnerabilities has prompted an immediate nationwide evaluation of school buildings. Inspectors have identified issues such as reduced strength, susceptibility to water ingress, and potential structural failures that pose significant risks to the safety of students and staff. The following project profile examines the impact on educational environments, the swift and decisive response from the Education Authorities and the School Trust, and the implementation of robust strategies to mitigate risks and ensure the safety and well-being of school communities.

In light of these challenges, we will explore the following key areas:

  • The specific problems associated with RAAC as they have manifested in this school building
  • The measures taken by educational authorities and government bodies to address these issues
  • Starfish Construction Group divisions working in tandem across the project phases as a single source principal contractor
  • How effective measures to restore trust in the school’s infrastructure led to the project’s success.

The client is an inner-city London Comprehensive co-educational academy for students aged 11–18. A survey identified RAAC within the gym hall roof. The School Trust, a previous client of Starfish Construction, invited us to tender a solution for the RAAC roof removal and replacement works. The scope of works included:

  • Removal of the existing roofing system
  • Removal of unexpected screed & bitumen layer
  • Removal of the RAAC
  • Installation of new steel beams (fan supports)
  • Installation of new TATA steel deck
  • Installation of new Langley roofing system
  • Installation of new roof fan units
  • Installation of new lighting & speaker system
  • Upgrade of roof safety system to facilitate future maintenance requirements.

Pre-works and Planning

Starfish Construction's single-source principal contractor approach begins by meticulously analysing all existing design information related to the roof's build-up. Our comprehensive technical surveying review approach enabled us to design and develop a robust structure to support the new roofing system. We conducted various surveys to inform the design process, including intrusive roof surveys, research and development surveys, and drone surveys. These assessments provided the necessary data to finalise the design. Structural engineers were engaged to oversee these elements, ensuring the structural integrity of the design and facilitating smooth progress once on-site work commenced.

Given the project's school building location, our team laid out extensive planning to ensure safety and professionalism. We installed an internal scaffold crash deck beneath the existing RAAC roof, mitigating risks associated with potential falls and securing the building's contents against any large sections of RAAC that might break free. Externally, the Starfish Access and Scaffolding in-house Division erected scaffolding around the perimeter and a uni-rolling roof sheeting system. This setup protected the work area from inclement weather and minimised noise and dust disruptions to the school and its pupils.

The London school project involved removing RAAC from the gym hall roof and replacing it with a new roofing system

The project included installing new steel beams, a TATA steel deck, a Langley roofing system

Roof fan units, lighting, and an upgrade to the safety system

Starfish Construction used comprehensive surveys and planning to ensure safety and minimal disruption

In-house group scaffolding and access division created innovative roof protection system

The project faced challenges, including unexpected roof anomalies and a request to complete work early for GCSE exams

Completed ahead of schedule, the project received high praise from the client and the Department for Education.

14 weeks

Duration

450 m2

Area of Roof Replaced

  • mul-raac-com-
  • mul-raac-com-
  • mul-raac-com-
  • mul-raac-com-
  • mul-raac-com-
  • mul-raac-com-
  • mul-raac-com-
  • mul-raac-com-
  • mul-raac-com-
  • mul-raac-com-
  • mul-raac-com-
  • mul-raac-com-

Successful Outcome

Despite the significant challenges and additional work requirements, we completed the project two weeks ahead of schedule which delighted the client. This project showcases Starfish Construction's single-source service capability and dedicated commitment to delivering high-quality results under demanding circumstances.

This pioneering DfE-funded RAAC removal and replacement project, the first in the education sector, was a litmus test for Starfish Construction and the broader UK education property portfolio. The project's exceptional outcome, rated A+, showcases our integrated divisions’ expertise and end-to-end building safety solutions.

As a single-source principal contractor, our turnkey solutions provide a single point of contact for reporting and communications. Our site team managed every project element with up-to-date, transparent and accessible online information for designated stakeholders, mitigating commercial and Health & Safety risks.

Client Feedback

I want to be the first to offer my thanks for the exceptional way in which this project was delivered. I understand it is always a team effort, so thanks to all who are involved.
On behalf of the Trust, I want to express our utmost satisfaction with the way this project has been managed. It stands as yet another outstanding example of our ongoing relationship with Starfish Construction and their highly professional team.
SB - Trust Director

The DfE is extremely pleased that the RAAC has now been removed from the school and has been very impressed with the way you and the Trust have handled the project. Thanks to your comprehensive updates, I'll be sharing this good news story and photos with internal colleagues who have been keen to see the final result.
Of the significant number of schools contacted at the end of August regarding DfE's change in approach to RAAC, your project is the first to have completed the full removal of RAAC. Ministers are keen to keep abreast of the progress of removing RAAC from schools, and this will certainly be reported to them.
Department of Education.

Project Scores from Consultant Property Management Consultants
The client’s property management and surveyors closely monitored the project, scoring us across the project. Starfish Construction achieved an incredible 10/10 across all scoring categories, a remarkable achievement for our team.
Starfish Construction employees were always courteous and polite and explained the work in a way we understood before the work started. They kept us informed at all stages of the work, taking steps to protect and respect our property and contents, together with a minimal environmental impact, keeping disruption and disturbance to a minimum.
Starfish Construction completed the work safely to the agreed timescale. We were happy with the quality of workmanship and the finished installation and were always able to contact Starfish Construction's staff if necessary, with queries/complaints dealt with in an efficient and prompt manner.

We were very satisfied with the overall service we received.

Final Comments from Property Consultants

Would you use us again? Yes

Key Strengths? Effective on-site management and client liaison

What could be better? Starfish Construction achieved exactly what we asked for. We have no comments for improvement.

The DfE is extremely pleased that the RAAC has been removed from the school and has been very impressed with how you and the Trust have handled the project. Thanks to your comprehensive updates, I'll share this good news story and photos with internal colleagues keen to see the final result.

Of the significant number of schools contacted at the end of August regarding DfE's change in approach to RAAC, your project is the first to have completed the full removal of RAAC. Ministers are keen to keep abreast of the progress of removing RAAC from schools, and this will certainly be reported to them.

Department for Education.